Define the handover route
UI fixes the approved baseline, milestones, release-to-site route and responsibility matrix before movement starts.

S06 · Managed Delivery to Operation
You have approved the equipment and need one coordination route from shipping release to site handover. UI coordinates the interfaces; any physical Product supply is quoted separately.
Selected contextCommercial phase: Lock the responsibility map · Pharma & Life Sciences · T03 · Automation & Industrial Data
Four controlled gates
One control file ties milestones, responsibilities and evidence from shipping release through the site interfaces to the client-approved acceptance record.
UI fixes the approved baseline, milestones, release-to-site route and responsibility matrix before movement starts.
We take over the authorised shipment status and coordinate packing and preservation evidence, freight, customs and delivery against the control file.
We control site readiness, installation method, work packages assigned to qualified parties and commissioning/SAT interfaces against the target start-up date.
Close the punch list, compile the handover dossier and prepare the acceptance record for client approval and signature; then move to lifecycle support where required.
Execution file
See the cumulative control file before you commission the route.
Release-to-site baseline and responsibility matrix
Shipping-release, freight, customs and delivery control file
Site-readiness, installation-method and SAT interface register
Approved handover dossier, punch-list closure and acceptance record
Commission only the execution you need
Baseline, interface coordination and handover remain separately scoped and auditable. Close the punch list, compile the handover dossier and prepare the acceptance record for client approval and signature; then move to lifecycle support where required.
Release-to-site baseline and responsibility matrix
Shipping-release, freight, customs and delivery control file · Site-readiness, installation-method and SAT interface register
Approved handover dossier, punch-list closure and acceptance record
Minimum execution file
A complete handover dossier is not required at the start. Missing evidence becomes a controlled action before the relevant release.
Approved scope, PO / contract, S04 import decision pack or S05 shipment-release recommendation and control dossier
Dispatch point → destination site, release status, packing list, preservation method, weights, dimensions and planned transport
Incoterms® rule, named place and edition; importer, EORI, customs route and delivery boundary
Unloading, lifting, foundations, utilities, permits and RAMS / installation-method requirements
Qualified parties, work packages, test scope, acceptance criteria and responsibility limits
Shipping release, site delivery, start-up and acceptance dates; MDR, punch list and handover requirements
Responsibility boundary
The UI coordination fee, Product supply and all equipment, freight, customs, site and third-party costs remain separate and visible.
UI documents the agreed responsibility matrix and coordinates interfaces, milestones and traceable records. UI acts as importer, carrier or installer only under a separate written scope and where legally permitted; statutory and conformity decisions remain with the competent parties, and final acceptance with the client.
UI coordinates the agreed route and evidence. Suppliers and named qualified parties execute freight, customs, installation, commissioning, SAT and statutory work.
No technical, commercial or delivery conclusion is presented as confirmed without traceable evidence.
The client retains scope, supplier and final-acceptance approvals; statutory and conformity decisions remain with the competent parties.

Start from the approved equipment
The assistant preserves the route, identifies missing owners and evidence, and prepares a scoped delivery brief.