S03 · Strategic Sourcing & Cost Engineering

Control the buying basis. Then award.

UI scopes only supplier qualification or bid comparison; an unready requirement routes to S09 technical definition before outreach.

Selected contextOriginal situation: Controle la entrega hasta la recepción y puesta en marcha. · Oil, Gas & Petrochemicals

Timing
1–4 weeks
Commercial basis
€1,500–€7,500 per commissioned phase
Engagement model
Fixed-fee discovery and/or decision pack
Begin with
A drawing, specification, BOM, duty, incumbent offer—or simply the purchase decision that is blocked.
Finish with
One output only: RFQ-readiness decision, qualified supplier shortlist or normalized award pack.

Buying context · Oil, Gas & Petrochemicals

A procurement decision must move, but RFQ readiness, qualified supply capability or a common technical and commercial bid basis has not yet been established.

When the cost of an unclear interface is measured in lost operating time—not only purchase price.

Start with this context
Decision to unlock
Is the requirement ready for market engagement, which suppliers are demonstrably capable, and which offer supports a defensible award?
Decision owners
Procurement / Strategic Sourcing · Engineering · Project · Finance / Cost Engineering
Industry in focus
Oil, Gas & Petrochemicals
Evidence for approval
RFQ readiness decision, capability-based shortlist, normalized quotations, clarification and deviation register, cost position and award recommendation.
Terms already in the requirement
RFQ pack · technical bid evaluation · bid tab · should-cost · TCO · deviation register

What the assignment changes

A shortlist is useful only when the buying basis is controlled.

01

Scope before search

Function, interfaces, standards, quantities, documents and acceptance are made explicit before market outreach.

02

Offers on one basis

Clarifications, exclusions, deviations, lead times and commercial assumptions are normalized before ranking.

03

Cost logic left visible

Should-cost and total-cost assumptions support negotiation without disguising uncertainty as precision.

Four controlled decisions

From a purchasing problem to a defensible award.

Each stage produces the evidence needed to unlock the next. Supplier outreach does not start before the buying basis is credible.

01 · Define

Confirm the requirement is ready to issue.

We test the technical and commercial scope, missing data, acceptance basis and supplier return structure. If the basis is incomplete, S09 defines it before outreach.

P01 · S09 · RFQ readiness reviewDecision-ready outputRFQ-readiness decision, exact gap register and the S09 definition route where required.
02 · Qualify

Gate capability before price.

Candidate suppliers are tested against process capability, standards, capacity, references, documentation and the actual delivery window.

P02 · S03 · Supplier discovery & capability gateDecision-ready outputQualified longlist or shortlist with an explained capability position.
03 · Compare

Normalize the quotations.

Scope gaps, deviations, exclusions, NRE, tooling, freight, lead, warranty and payment assumptions are brought onto one bid basis.

P03 · S03 · Bid normalization & award packDecision-ready outputTechnical bid evaluation, commercial bid tab and clarification/deviation register.
04 · Recommend

Make the decision auditable.

Should-cost, TCO, delivery exposure and residual risk are combined into a negotiation and award position—not a supplier list.

P03 · S03 · Bid normalization & award packDecision-ready outputCost benchmark, negotiation levers and documented shortlist or award recommendation.

Buy only the decision that is missing

Define. Qualify. Award.

Requirement readiness, supplier qualification and bid evaluation are separate commitments. Start where the evidence stops and advance only when the next decision is justified.

P01

RFQ readiness review

What this engagement buys

A decision on whether the existing technical and commercial evidence can support supplier outreach, plus the exact gaps that must be closed first.

Commercial basisFixed review fee after evidence checkCheck RFQ readiness
P02

Supplier discovery & capability gate

What this engagement buys

A capability-based longlist or shortlist, documented qualification evidence and a controlled supplier-contact route.

Commercial basis€2,500–€7,500 · fixed assignmentFind qualified suppliers
P03

Bid normalization & award pack

What this engagement buys

Technical evaluation, commercial bid tab, clarification and deviation register, cost position and an auditable award recommendation.

Commercial basis€1,500–€6,000 · fixed decision packCompare the offers

Minimum useful evidence

Send what already exists. Gaps become part of the work.

A completed RFQ is not required. The first review determines whether the next paid step should be definition, sourcing, comparison or cost engineering.

01

Technical basis

What to include

Drawing, specification, BOM, duty point, material, standard, interfaces and required certificates.

02

Commercial basis

What to include

Quantity, forecast, delivery location, Incoterm, target date, warranty and payment constraints.

03

Market evidence

What to include

Incumbent offer, supplier list, previous PO, quotations, known deviations or a target cost.

04

Decision window

What to include

Award date, outage, production need, project milestone and consequence of delay.

Build the sourcing decision

Execution boundary

UI structures and evidences the decision. The client retains approval authority.

The assignment is scoped around the decision being purchased. Supplier contracting, regulated design authority and final technical acceptance remain explicitly allocated.

01

No supplier is recommended only because its headline price is lowest.

02

Unverified equivalence, capacity or certification is never presented as confirmed.

03

Should-cost ranges expose assumptions and data quality; they are not disguised quotations.

04

The client approves the RFQ, shortlist, negotiation position and award.

Start with the blocked decision

Build the sourcing decision.

Send the requirement, offers or supplier problem already in front of you. The assistant will preserve the S03 context, identify the missing evidence and build the preliminary brief.

Build the sourcing decision Email the sourcing requirement