Baseline before expediting
Scope, dates, submittals, ITP points, responsibilities and acceptance are aligned before status reporting starts.

S05 · Project Execution & Supplier Control
UI fixes the order baseline, verifies supplier evidence and coordinates the technical, quality and schedule decisions required before shipment release.
What the assignment changes
Scope, dates, submittals, ITP points, responsibilities and acceptance are aligned before status reporting starts.
Documents, photographs, records, inspections and open points support progress instead of unsupported supplier claims.
NCRs, deviations, concessions, packing, documents and logistics interfaces are reviewed before any release recommendation.
Four controlled decisions
Each stage turns supplier activity into evidence that engineering, quality, procurement and the project owner can use.
We reconcile PO, specification, supplier offer, approved deviations, schedule, document list, ITP and communication route.
Milestones, material status, manufacturing operations, sub-suppliers and document returns are checked against dated evidence.
Witness and hold points, FAT readiness, NCRs, concessions and corrective actions are coordinated against acceptance requirements.
Final documents, open points, packing, preservation and logistics interfaces are reviewed before the shipment-release recommendation.
Match control to the live order
Order setup, recurring supplier control and the final inspection/FAT and shipment-release recommendation are scoped separately around the evidence and risk already present.
A reconciled PO file, document and inspection schedule, responsibility matrix, open-point register and evidence-based reporting format.
Recurring evidence checks across schedule, submittals, manufacture, changes, NCRs, recovery actions, forecast shipment-release date and readiness.
Readiness review, qualified inspection coordination, evidence file, open-point position and a documented recommendation to release, conditionally release or hold shipment.
Minimum useful evidence
A perfect dossier is not required. The first review separates missing evidence from actual supplier performance risk.
PO, supplier quotation, specification, approved deviations, Incoterm and payment milestones.
Drawings, datasheets, document requirements, interfaces, applicable codes and acceptance criteria.
Schedule, document register, ITP/QCP, FAT procedure, inspection points and reporting rhythm.
Destination, required-on-site date, packing, preservation, Incoterm and the owners of freight, customs, unloading and site acceptance.
Execution boundary
The assignment names who owns design, manufacture, inspection, concession approval, the shipment-release decision and final acceptance.
Supplier progress is not reported as verified without dated evidence.
Inspection does not transfer manufacturing responsibility from the supplier.
UI does not approve regulated design changes or concessions on the client’s behalf.
Freight, customs, installation, commissioning and site acceptance continue through S06 and are included only when separately contracted.

Start with what exists
Send the PO, supplier file, current schedule and the issue now threatening shipment release. The assistant preserves the S05 context and identifies the first evidence gap.